Pages

Friday, May 13, 2016

Design Wall Monday May 9, 2016

With DH having the croup and the greats visiting, not much was done in the studio last week.
Catch-Up Goals for May:
1. Complete T-shirt top. Still working on putting top together.
2. Bring t-shirt top for quilting on Saturday of this week. Made arrangements to bring top to DD#1 for quilting.
3. Bind t-shirt quilt by May 15. It will be machine bound.
4. Work on DD#1s Minion Quilt. 
5. Machine Bind Marie's Quilt &
Bella's Quilt by 5/9. Made arrangement to pick up quilts Monday morning from DD#1 as she travels back to Houston. Will machine bind both on Monday before bowling.DONE!!! And Delivered.
6. Work on UFO Challenge APQ #7-Binding on Soccer Beauty.
7. Complete tying of PJ's Quilt(UFO Challenge APQ#1).
8. Complete J&B Blocks 9-12. Block 9 is done. Will get block 10 on way out on Tuesday and hopefully kitted on Friday and sewn at DD#1 while she quilts t-shirt top.DONE.
9. Start KS Challenge Project - Part 1 -Background. This will have to wait until after 15th.

No comments:

Post a Comment