Pages

Sunday, September 24, 2017

Design Wall

Goal 1:  BBSWQ - Adding a row to top and bottom then have to decide if I want to buy more fabric and make it bigger. There will be a narrow black border so that the stars float and then maybe a border of the leftover strip pieces with black binding.
BBSWQ


GOAL 2:  BH Leader/Ender -- My plan is to piece 10 halves between each part of BBSWQ. Once I get the halves pieced and ironed, I will start on putting quarter square triangles together.
GOAL 3: Studio -- Go thru 2 bins and clean off long table. The mess is still there only hiding in office area!

GOAL 4: Design Wall -- The plan is to get to Lowe's soon to get the foam core boards. Actually it was suppose to happen already but didn't! I hate shopping period.

1 comment:

  1. I understand. I still had a mess, it was at your house for a year! LOL

    ReplyDelete