Pages

Saturday, December 2, 2017

Design Wall Progress and Stash Report

Design Wall:
Goal 3: Embroidery station is set up and taken down. Saturday's work was suppose to involve towels. It had just gotten back after 6 weeks but is still not working. So I  took the whole thing to the shop in Broussard. They promised it back by Christmas.  It took the whole day.
Goal 4: UFO's-Trash/Strings - I  needed 10 more blocks at least. I have 2 Done. Each block has 4 parts. Hopefully this will become a flimsy by end of January.
 KS BOM 2014 - The blocks are on the design wall but may be there until March waiting for sashing.  
DD#1's bow tie blocks - 5 more were made. My goal is 10 for the week. (Gosh- they are small!)
Goal 1BH Leader/Ender -- flimsy is done. Next I want to get a back for it. 
Goal 2: Bindings on customer's quilts.  DONE! Still need to deliver two.


Stash Report
Fabric IN This Week: 0 yards 
Fabric IN for November: 0 yards
Fabric IN for December:
Fabric IN YTD: 72 10/12 yards
Fabric OUT This Week: yards
Fabric Out for November: 0.25 yards
Fabric Out for December:  0 yards
Fabric OUT YTD: 77 yards
Reduction/Enhancement This Week: 0  yards
Reduction/Enhancement November: 0.25 yards
Reduction/Enhancement December:  0  yards
Reduction/Enhancement YTD:  4 1/6 yard
   There should be movement by end of December since Blue Binding Star Wedding quilt will be finished and delivered by the end of the month which should be about 10 yards. 3 of the planned Christmas gifts (a cozy, a large bag, and a small bag) also will be made of fabric so that will be at least 3 more yards. Hopefully, no fabric will come to stay that doesn't immediately go out as in pillowcases.

1 comment:

  1. I totallly lost control of the fabric in/out situation, I am sure more has gone out than come in, but there is no accounting of it. I figure i will start again in january.

    ReplyDelete