Stash Report
Fabric Added: 1.75 yards (There were cute fleurs de lis that just had to come home w/me.)
Fabric Added in April: 12.75 yards
Fabric Added YTD: 35.56 yards (That's 9 yds/month.)
Fabric Used This Week: 5 yards (Spirit's headboards covered)
Fabric Used in April: 22.5 yards
Fabric Used YTD: 95.06 yards (23.76 yds/m)
Stash Enhancement/ Busted: 59.5 yards
Even though I bought fabric this week, I did use some recovering the headboards for Spirit's room. I am now back to binding: 1) Tanya's graduation/bday quilt; 2) DD#1's strip sew-as-you-go quilt.
The fabric I will be sewing this week is guild fabric so won't count against/for my stash, but if I manage to finish binding Tanya's quilt then next week's numbers will be great.
DH and I went to Ms for the GSQA meeting and it was peaceful. The batteries still won't keep a charge but I prepared for that. All I need to pack is a battery powered radio to be able to truly dry camp.LOL
Lator Gators. May all the fabric you desire appear in your stash. Keep 2011 STRESS FREE!
No comments:
Post a Comment