Pages

Monday, May 1, 2017

Design Wall/Plans 5/1/17

Design Wall -
Plans for May 1 - 7: All plans depend on today's doctor visit results.
Need 120 more
Ready & Waitin
Projects This Week:
Hand quilt S. Quilt-Priority #1 - hopefully in studio. I'll wait until Wednesday for handyman then I have to start handquilting it. I really don't want to start quilting it on round frame and then switch to long frame. I wonder if DH would consider dismantling the dining room table or moving the living room furniture out. I bet then he would get involved with finding the handyman. LOL 
Studio! I need it done so I can set up my beautiful hard rock maple handquilting frame that my mom bought me over 30 years ago.
Construct side row of BH leader/ender project.
Make more blue quarter square triangles- I need (hundreds) more of blue, neutral, red, and possibly black/white(last row/border).
Work on Blue Star Wedding Quilt - put together what is cut out.
Work on binding of DD's quilt
Continue crocheting.
Other News: 
Made doctor's appointment for DH against his wishes. I am concerned about his foot and hip. Sometimes you have to take the bull by the horns! Hopefully, it is just me being a worry-wart and there is nothing seriously wrong. I'll post results tomorrow.
Lator Gators.

3 comments:

  1. Hi Charlene,
    That sounds very ambitious for May 1-7! WOW - I hope you are able to get all that done. I had to LOL about the dining room table or the living room furniture. ~smile~
    Roseanne

    ReplyDelete
  2. I don't blame you for wanting to use the quilt frames your mother gave you. It's so hard to be ready to quilt and not be able to set it up. It's happened to me and I get cranky.

    ReplyDelete
  3. Oh my! That red in your post makes it look 3-D! You know I love that octogenarian Halloween of Sammie's!

    ReplyDelete